The progressive opening of all phases of this project will be completed by mid-2011, providing six lanes in either direction across the two Gateway Bridges.
The $1.88 billion upgrade includes:
The $1.88 billion upgrade includes:
- Construction of a second Gateway Bridge including a new shared pedestrian/cycle path.
- Construction of a new Gateway Motorway deviation providing faster travel times and enhanced access to Brisbane Airport.
- Additional Motorway lanes and improved connections to the Motorway from Wynnum Road, Lytton Road, the Port of Brisbane Motorway and Kingsford Smith Drive.
- Refurbishing the existing Gateway Bridge to reflect iconic new lighting and urban design featured in the design of the second bridge.
No comments:
Post a Comment